DCSIMG

Engineering Design & Construction

Knovel helps Design and Construction engineers complete projects faster, better and with less associated risk.

Engineering Managers in the Engineering Design and Construction industry respond to critical business challenges: improving cost efficiency, meeting increasingly aggressive timelines, developing the most compelling bids, maintaining safety, mitigating risk mitigation and getting the most out of the talent they rely upon.

Furthermore, their engineers have their training and expertise repeatedly stretched by the high variation they experience between projects and the ever more interdisciplinary nature of engineering. Time pressures are relentless, and it’s common to encounter situations where project specifications and company best practices are not sufficient. Documentation to justify why one approach was taken over another is a must.

Providing guidance and best practice information on topics spanning construction methods, material strengths and tolerances, and process design, through safety and compliance, Knovel provides the answers needed to get the job done.

In Good Company

7 of the top 15 Engineering Design and Construction firms in the world turn can attest—Knovel can help you solve the most critical business challenges.

”Using Knovel, I found critical information early in the design phase, so I didn’t waste time wandering down the wrong path. I’d estimate that checking Knovel first to optimize the process design saved me at least a month of rework time, significantly condensing the project timeline and improving process quality.“– Associate Process/Specialty Engineer, Major Engineering Company

”Knovel can help with my projects by providing ready access to engineering/technical information at my desktop, and access to a technological tool that will aid in development and retention of top engineering talent.“– Mechanical Engineer & VP, Parsons Corporation

Engineers at AMEC, Bechtel, Black & Veatch, Burns & McDonnell, Camp Dresser & McKee, Arup, Parsons, CH2M Hill, Foster Wheeler and Shaw Group tap Knovel as they seek answers to technical questions.

READ A SOLUTION STORY. The Lake Champlain Bridge spanned the state line between Crown Point, New York and Chimney Point, was demolished due to severe structural deterioration and unsafe conditions. In this solution story, we analyze the cause of problems in the Lake Champlain Bridge, and suggest how these problems could be addressed in the new bridge.